← All FR Documents ·← Back to 2024-01359
Final Rule

Drawbridge Operation Regulation; Old River, Between Victoria Island and Byron Tract, CA

In Plain English

What is this Federal Register notice?

This is a final rule published in the Federal Register by Homeland Security Department, Coast Guard. Final rules have completed the public comment process and establish legally binding requirements.

Is this rule final?

Yes. This rule has been finalized. It has completed the notice-and-comment process required under the Administrative Procedure Act.

Who does this apply to?

Consult the full text of this document for specific applicability provisions. The affected parties depend on the regulatory scope defined within.

When does it take effect?

This document has been effective since March 8, 2024.

Why it matters: This final rule amends regulations in 33 CFR Part 117.

📋 Related Rulemaking

This final rule likely has a preceding Notice of Proposed Rulemaking (NPRM), but we haven't linked it yet.

Our system will automatically fetch and link related NPRMs as they're discovered.

Regulatory History — 64 documents in this rulemaking

  1. Jan 24, 2024 2024-01359 Final Rule
    Drawbridge Operation Regulation; Housatonic River, Stratford, CT
  2. Jan 24, 2024 2024-01358 Final Rule
    Drawbridge Operation Regulation; Saugatuck River, Westport, CT
  3. Jan 24, 2024 2024-01360 Final Rule
    Drawbridge Operation Regulation; Mianus River, Greenwich, CT
  4. Feb 2, 2024 2024-02084 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Jupiter, FL
  5. Feb 5, 2024 2024-02187 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  6. Feb 21, 2024 2024-03455 Proposed Rule
    Drawbridge Operation Regulation; Reynolds Channel, Atlantic Beach, NY
  7. Feb 23, 2024 2024-03462 Final Rule
    Drawbridge Operation Regulation; Sloop Channel, Nassau County, NY
  8. Feb 23, 2024 2024-03463 Final Rule
    Drawbridge Operation Regulation; Long Creek, Nassau County, NY
  9. Feb 29, 2024 2024-04274 Final Rule
    Drawbridge Operation Regulation; Ashtabula River, Ashtabula, OH
  10. Feb 29, 2024 2024-04273 Final Rule
    Drawbridge Operation Regulation; River Rouge, Detroit, MI; Correction
  11. Mar 8, 2024 2024-05007 Final Rule
    Drawbridge Operation Regulation; Old River, Between Victoria Island and Byron...
  12. Mar 8, 2024 2024-04952 Final Rule
    Drawbridge Operation Regulation; Portage River, Port Clinton, OH
  13. Apr 8, 2024 2024-07366 Proposed Rule
    Drawbridge Operation Regulation; Milwaukee, Menomonee, and Kinnikinnic Rivers...
  14. Apr 8, 2024 2024-07368 Final Rule
    Drawbridge Operation Regulation; Black River, Lorain, OH
  15. Apr 8, 2024 2024-07367 Final Rule
    Drawbridge Operation Regulation; Maumee River, Toledo, OH
  16. Apr 10, 2024 2024-07578 Proposed Rule
    Drawbridge Operation Regulation; Umpqua River, Reedsport, OR
  17. May 7, 2024 2024-09922 Final Rule
    Drawbridge Operation Regulation; Reynolds Channel, Atlantic Beach, NY
  18. May 20, 2024 2024-10980 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Be...
  19. May 28, 2024 2024-11608 Final Rule
    Drawbridge Operation Regulation; Cuyahoga River, Cleveland, OH
  20. May 31, 2024 2024-11837 Final Rule
    Drawbridge Operation Regulation; Sloop Channel, Nassau County, NY
  21. Jun 21, 2024 2024-13472 Proposed Rule
    Drawbridge Operation Regulation; Townsend Gut, Southport, ME
  22. Jul 2, 2024 2024-14545 Final Rule
    Drawbridge Operation Regulation; Three Mile Slough, Near Rio Vista, CA
  23. Jul 15, 2024 2024-15233 Proposed Rule
    Drawbridge Operation Regulation; Miami River, North Fork, Miami, FL
  24. Jul 31, 2024 2024-16824 Proposed Rule
    Drawbridge Operation Regulation; Rancocas Creek, Burlington County, NJ
  25. Aug 7, 2024 2024-17452 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  26. Sep 3, 2024 2024-19697 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL; Correction
  27. Sep 26, 2024 2024-21971 Final Rule
    Drawbridge Operation Regulation; Milwaukee, Menomonee, and Kinnikinnic Rivers...
  28. Oct 3, 2024 2024-22822 Proposed Rule
    Drawbridge Operation Regulation; Hackensack River, Little Snake Hill, NJ
  29. Oct 15, 2024 2024-23769 Final Rule
    Drawbridge Operation Regulation; Wappinger Creek, New Hamburg, New York
  30. Oct 16, 2024 2024-23738 Final Rule
    Drawbridge Operation Regulation; Townsend Gut, Southport, ME
  31. Oct 25, 2024 2024-24711 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Jupiter, FL
  32. Oct 25, 2024 2024-24847 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Beaufort, SC
  33. Oct 30, 2024 2024-24970 Final Rule
    Drawbridge Operation Regulation; Dutch Kills, Queens County, NY
  34. Nov 4, 2024 2024-25603 Final Rule
    Drawbridge Operation Regulation; Sacramento River, Rio Vista, CA
  35. Nov 6, 2024 2024-25660 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Be...
  36. Jan 8, 2025 2024-31328 Proposed Rule
    Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Osprey, FL
  37. Jan 17, 2025 2025-00573 Final Rule
    Drawbridge Operation Regulation; Umpqua River, Reedsport, OR
  38. Feb 7, 2025 2025-02368 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  39. Mar 24, 2025 2025-04917 Final Rule
    Drawbridge Operation Regulation; Sandusky Bay, Sandusky, OH
  40. Mar 25, 2025 2025-04918 Proposed Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  41. Mar 26, 2025 2025-05091 Final Rule
    Drawbridge Operation Regulation; Hackensack River, Little Snake Hill, NJ
  42. Apr 4, 2025 2025-05748 Final Rule
    Drawbridge Operation Regulation; Miami River, North Fork, Miami, FL
  43. Apr 4, 2025 2025-05778 Final Rule
    Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Osprey, FL
  44. Apr 7, 2025 2025-05875 Final Rule
    Drawbridge Operation Regulation; Honker Cut, Between Empire Tract and King Is...
  45. Apr 17, 2025 2025-06394 Final Rule
    Drawbridge Operation Regulation; Passaic River, Harrison, New Jersey
  46. Apr 24, 2025 2025-07058 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Be...
  47. May 19, 2025 2025-08888 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL; Extension o...
  48. May 20, 2025 2025-08990 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Beaufort, SC
  49. Jun 9, 2025 2025-10418 Proposed Rule
    Drawbridge Operation Regulation; Inside Thorofare, Ventnor City, New Jersey
  50. Jun 23, 2025 2025-11495 Final Rule
    Drawbridge Operation Regulation; East River, Green Bay, WI
  51. Jul 24, 2025 2025-13882 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Fort Lauderd...
  52. Aug 1, 2025 2025-14593 Final Rule
    Drawbridge Operation Regulation; Southern Branch of the Elizabeth River, Ches...
  53. Sep 9, 2025 2025-17302 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, North Myrtle...
  54. Sep 16, 2025 2025-17888 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  55. Oct 1, 2025 2025-19114 Final Rule
    Drawbridge Operation Regulation; Canaveral Barge Canal, Port Canaveral, FL
  56. Nov 18, 2025 2025-20164 Proposed Rule
    Drawbridge Operation Regulation; Newark Bay, Between the City of Newark and C...
  57. Nov 24, 2025 2025-20726 Final Rule
    Drawbridge Operation Regulation; Bass River, Beverly, MA
  58. Nov 26, 2025 2025-21198 Proposed Rule
    Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA
  59. Dec 1, 2025 2025-21670 Proposed Rule
    Drawbridge Operation Regulation; Passaic River, Between the City of Newark an...
  60. Jan 20, 2026 2026-00931 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, North Myrtle...
  61. Jan 20, 2026 2026-00932 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Fort Lauderd...
  62. Jan 26, 2026 2026-01398 Final Rule
    Drawbridge Operation Regulation; Inside Thorofare, Ventnor City, New Jersey
  63. Jan 26, 2026 2026-01400 Final Rule
    Drawbridge Operation Regulation; Technical Amendment; Removal of Obsolete Dra...
  64. Feb 3, 2026 2026-02175 Final Rule
    Drawbridge Operation Regulation; New Rochelle Harbor, Westchester County, NY

Document Details

Document Number2024-05007
TypeFinal Rule
PublishedMar 8, 2024
Effective DateMar 8, 2024
RIN1625-AA09
Docket IDDocket No. USCG-2023-0231
Text FetchedYes

Agencies & CFR References

CFR References:

Linked CFR Parts

PartNameAgency
No linked CFR parts

Paired Documents

TypeProposedFinalMethodConf
No paired documents

Related Documents (by RIN/Docket)

Doc #TypeTitlePublished
2026-02175 Final Rule Drawbridge Operation Regulation; New Roc... Feb 3, 2026
2026-01398 Final Rule Drawbridge Operation Regulation; Inside ... Jan 26, 2026
2026-01400 Final Rule Drawbridge Operation Regulation; Technic... Jan 26, 2026
2026-00931 Final Rule Drawbridge Operation Regulation; Atlanti... Jan 20, 2026
2026-00932 Final Rule Drawbridge Operation Regulation; Atlanti... Jan 20, 2026
2025-21670 Proposed Rule Drawbridge Operation Regulation; Passaic... Dec 1, 2025
2025-21198 Proposed Rule Drawbridge Operation Regulation; Wishkah... Nov 26, 2025
2025-20726 Final Rule Drawbridge Operation Regulation; Bass Ri... Nov 24, 2025
2025-20164 Proposed Rule Drawbridge Operation Regulation; Newark ... Nov 18, 2025
2025-19114 Final Rule Drawbridge Operation Regulation; Canaver... Oct 1, 2025

External Links

⏳ Requirements Extraction Pending

This document's regulatory requirements haven't been extracted yet. Extraction happens automatically during background processing (typically within a few hours of document ingestion).

Federal Register documents are immutable—once extracted, requirements are stored permanently and never need re-processing.

Full Document Text (2,573 words · ~13 min read)

Text Preserved
<RULE> DEPARTMENT OF HOMELAND SECURITY <SUBAGY>Coast Guard</SUBAGY> <CFR>33 CFR Part 117</CFR> <DEPDOC>[Docket No. USCG-2023-0231]</DEPDOC> <RIN>RIN 1625-AA09</RIN> <SUBJECT>Drawbridge Operation Regulation; Old River, Between Victoria Island and Byron Tract, CA</SUBJECT> <HD SOURCE="HED">AGENCY:</HD> Coast Guard, Department of Homeland Security (DHS). <HD SOURCE="HED">ACTION:</HD> Temporary interim rule and request for comments. <SUM> <HD SOURCE="HED">SUMMARY:</HD> The Coast Guard is temporarily modifying the operating schedule that governs the draw of the California Department of Transportation (Route 4) highway bridge, mile 14.8 between Victoria Island and Byron Tract, CA. This action is necessary to allow the bridge owner to complete rehabilitation of the bridge after a continuing unexpected delay in installing We can't have and testing of the custom-made electronics. </SUM> <EFFDATE> <HD SOURCE="HED">DATES:</HD> Effective March 8, 2024, 33 CFR 117.183 is stayed until 5 p.m. on May 31, 2024. The temporary addition of 33 CFR 117.T184 is effective from 5 p.m. on March 8, 2024 through 5 p.m. on May 31, 2024. Comments and related material must reach the Coast Guard on or before April 8, 2024. </EFFDATE> <HD SOURCE="HED">ADDRESSES:</HD> To view documents mentioned in this preamble as being available in the docket, go to <E T="03">https://www.regulations.gov.</E> Type the docket number (USCG-2023-0231) in the “SEARCH” box and click “SEARCH”. In the Document Type column, select “Supporting & Related Material”. <FURINF> <HD SOURCE="HED">FOR FURTHER INFORMATION CONTACT:</HD> If you have questions on this temporary interim rule, call or email Carl Hausner, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510-437-3516, email <E T="03">Carl.T.Hausner@uscg.mil.</E> </FURINF> <SUPLINF> <HD SOURCE="HED">SUPPLEMENTARY INFORMATION:</HD> <HD SOURCE="HD1">I. Table of Abbreviations [Delete/Add Any Abbreviations Not Used/Used in This Document]</HD> <EXTRACT> <FP SOURCE="FP-1">CFR Code of Federal Regulations</FP> <FP SOURCE="FP-1">Caltrans California Department of Transportation</FP> <FP SOURCE="FP-1">CADFW California Department of Fish and Wildlife</FP> <FP SOURCE="FP-1">DHS Department of Homeland Security</FP> <FP SOURCE="FP-1">FR Federal Register</FP> <FP SOURCE="FP-1">NPRM Notice of proposed rulemaking</FP> <FP SOURCE="FP-1">Pub. L. Public Law</FP> <FP SOURCE="FP-1">§ Section </FP> <FP SOURCE="FP-1">U.S.C. United States Code</FP> </EXTRACT> <HD SOURCE="HD1">II. Background Information and Regulatory History</HD> The Coast Guard is issuing this temporary interim rule without prior notice and opportunity to comment pursuant to authority under section 4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are “impracticable, unnecessary, or contrary to the public interest.” Under 5 U.S.C. 553(b), the Coast Guard finds that good cause exists for not publishing a notice of proposed rulemaking (NPRM) with respect to this rule because it is impracticable. This bridge is non-operational and will be non-operational until rehabilitation work can be completed. On October 27, 2022, the Coast Guard issued a General Deviation which allowed the bridge owner, Caltrans, to deviate from the current operating schedule in 33 CFR 117.183 to conduct major mechanical and electrical rehabilitation of the bridge. Due to delays in procuring materials, vandalism of critical electrical submarine cables, and an active winter storm season, the project ran past the end date of April 23, 2023, of the General Deviation. The bridge could not be brought back to operating condition until the delivery of the critical Program Logic Control circuit and the replacement or repairs to the submarine cable could be made. On October 17, 2023, Caltrans informed the Coast Guard that critical electronic components, needed to complete the rehabilitation of the bridge, were still on back-order and not expected to be delivered in time for a project completion deadline of November 30, 2023. It was anticipated that the parts would be delivered in the beginning of the new year, the bridge work completed and the span operational by March 1, 2024. There was insufficient time to provide a reasonable comment period and then consider those comments before issuing the modification. On January 30, 2024, Caltrans notified the Coast Guard that the bridge would not be operational by March 1, 2024. The back ordered critical electronic components have been received and are currently being installed. After the installation of the electronic components, critical testing of the span must be conducted before it is put back into operation. Therefore, it is now anticipated the span will be fully operational by 5 p.m. on May 31, 2024. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective in less than 30 days after publication in the <E T="04">Federal Register</E> . For reasons presented above, delaying the effective date of this rule would be impracticable and contrary to the public interest due to the fact that the bridge is currently inoperable and will not be back into operation until the rehabilitation work can be completed. We are soliciting comments on this rulemaking. If the Coast Guard determines that changes to the temporary interim rule are necessary, we will publish a temporary final rule or other appropriate document. <HD SOURCE="HD1">III. Legal Authority and Need for Rule</HD> The Coast Guard is issuing this temporary interim rule under authority in 33 U.S.C. 499. The Coast Guard is modifying the operating schedule that governs the California Department of Transportation (Route 4) highway bridge, mile 14.8 between Victoria Island and Byron Tract, California. The Caltrans Route 4 highway bridge has a vertical clearance, in the closed position, of 12.7 feet at mean high water and unlimited vertical clearance when opened. The existing drawbridge regulation, 33 CFR 117.183, states that the draw of the California Department of Transportation (Route 4) highway bridge, mile 14.8 between Victoria Island and Byron Tract, shall open on signal if at least four hours notice is given to the drawtender at the Rio Vista bridge across the Sacramento River, mile 12.8. Caltrans, the bridge owner, has requested this modification as additional time is required to complete the bridge rehabilitation. Drawtender logs, during a previous test deviation conducted May 5, 2021, to August 7, 2021, recorded the following number of CADFW vessel openings: four in May, eight in June, four in July, and two in August. One survey vessel passed in July. No recreational or commercial vessels requested an opening of the bridge span during that 90-day test deviation. On October 27, 2022, the Coast Guard issued a General Deviation which allowed the bridge owner, Caltrans, to deviate from the current operating schedule in 33 CFR 117.183 to conduct major mechanical and electrical rehabilitation of the bridge. Due to various delays, the project ran past the end date of April 23, 2023, of the General Deviation. On April 20, 2023, the Coast Guard published a temporary interim rule with request for comments that extended the deviation from the operating schedule until November 30, 2023 (88 FR 24336). During the comment period that ended May 22, 2023, no comments were received. On October 17, 2023, Caltrans informed the Coast Guard that critical electronic components, needed to complete the rehabilitation of the bridge, were still on back order and not expected to be delivered in time for a project completion deadline of November 30, 2023. It was anticipated that the parts would be delivered in the beginning of 2024, the bridge work completed and the span operational by March 1, 2024. During the comment period that ended December 28, 2023, no comments were received (88 FR 83026). On January 30, 2024, Caltrans once again informed the Coast Guard that an extension would be needed to complete the rehabilitation of the bridge. The back ordered electronic components have been delivered but installation of the parts is still ongoing, and the span will require testing before it can be put back in service. This temporary interim rule allows for a further deviation from the operating schedule until May 31, 2024. <HD SOURCE="HD1">IV. Discussion of the Rule</HD> The Coast Guard is issuing this rule, which permits a temporary deviation from the operating schedule that governs the California Department of Transportation (Route 4) highway bridge, mile 14.8 between Victoria Island and Byron Tract, California. This rule allows the bridge to be secured in the closed-to-navigation position through 5 p.m. on May 31, 2024. As part of the rehabilitation of the bridge, Caltrans has removed and is replacing all the electronics as well as key mechanical components that control the operation of the swing span. On January 31, 2023, vandals caused damage to one of the three newly installed custom-made submarine cables. On April 1, 2023, the contractor informed Caltrans that the custom-made Program Logic Control circuit, which is the circuit that controls the operation of the swing span, was delayed due to supply chain issues. These two critical components of bridge operations, as well as an active storm season, caused the delay of the completion of the rehabilitation of the bridge. On October 17, 2023, Caltrans informed the Coast Guard that critical electronic components, needed to complete the rehabilitation of the bridge, were still on back order and not expected to be delivered to meet the November 30, 2023, deadline, to bring the swing span back into operation. It was anticipated that the parts would be delivered in ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Preview showing 10k of 17k characters. Full document text is stored and available for version comparison. ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
This text is preserved for citation and comparison. View the official version for the authoritative text.