← All FR Documents
Proposed Rule

Air Plan Approval; Pennsylvania; Attainment Plan for the Indiana Nonattainment Area for the 2010 1-Hour Sulfur Dioxide National Ambient Air Quality Standard

In Plain English

What is this Federal Register notice?

This is a proposed rule published in the Federal Register by Environmental Protection Agency. Proposed rules invite public comment before becoming final, legally binding regulations.

Is this rule final?

No. This is a proposed rule. It has not yet been finalized and is subject to revision based on public comments.

Who does this apply to?

Consult the full text of this document for specific applicability provisions. The affected parties depend on the regulatory scope defined within.

When does it take effect?

No specific effective date is indicated. Check the full text for date provisions.

Document Details

Document Number2024-11175
TypeProposed Rule
PublishedJun 7, 2024
Effective Date-
RIN-
Docket IDEPA-R03-OAR-2024-0024
Text FetchedYes

Agencies & CFR References

CFR References:

Linked CFR Parts

PartNameAgency
No linked CFR parts

Paired Documents

TypeProposedFinalMethodConf
No paired documents

Related Documents (by RIN/Docket)

Doc #TypeTitlePublished
2024-20598 Final Rule Air Plan Approval; Pennsylvania; Attainm... Sep 13, 2024

External Links

⏳ Requirements Extraction Pending

This document's regulatory requirements haven't been extracted yet. Extraction happens automatically during background processing (typically within a few hours of document ingestion).

Federal Register documents are immutable—once extracted, requirements are stored permanently and never need re-processing.

Full Document Text (9,536 words · ~48 min read)

Text Preserved
ENVIRONMENTAL PROTECTION AGENCY <CFR>40 CFR Part 52</CFR> <DEPDOC>[EPA-R03-OAR-2024-0024; FRL-11529-01-R3]</DEPDOC> <SUBJECT>Air Plan Approval; Pennsylvania; Attainment Plan for the Indiana Nonattainment Area for the 2010 1-Hour Sulfur Dioxide National Ambient Air Quality Standard</SUBJECT> <HD SOURCE="HED">AGENCY:</HD> Environmental Protection Agency (EPA). <HD SOURCE="HED">ACTION:</HD> Proposed rule. <SUM> <HD SOURCE="HED">SUMMARY:</HD> The Environmental Protection Agency (EPA) is proposing to approve a state implementation plan (SIP) revision submitted by the Commonwealth of Pennsylvania (Pennsylvania). This revision pertains to the attainment plan for the Indiana, Pennsylvania (PA) nonattainment area for the 2010 1-Hour Sulfur Dioxide (SO <E T="52">2</E> ) national ambient air quality standard (NAAQS). This action is being taken under the Clean Air Act (CAA). </SUM> <EFFDATE> <HD SOURCE="HED">DATES:</HD> Written comments must be received on or before July 8, 2024. </EFFDATE> <HD SOURCE="HED">ADDRESSES:</HD> Submit your comments, identified by Docket ID No. EPA-R03-OAR-2024-0024 at <E T="03">www.regulations.gov,</E> or via email to <E T="03">goold.megan@epa.gov.</E> For comments submitted at <E T="03">Regulations.gov,</E> follow the online instructions for submitting comments. Once submitted, comments cannot be edited or removed from <E T="03">Regulations.gov.</E> For either manner of submission, the EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be confidential business information (CBI) or other information whose disclosure is restricted by statute. Multimedia submissions (audio, video, etc.) must be accompanied by a written comment. The written comment is considered the official comment and should include discussion of all points you wish to make. The EPA will generally not consider comments or comment contents located outside of the primary submission ( <E T="03">i.e.,</E> on the web, cloud, or other file sharing system). For additional submission methods, please contact the person identified in the <E T="02">For Further Information Contact</E> section. For the full EPA public comment policy, information about CBI or multimedia submissions, and general guidance on making effective comments, please visit <E T="03">www.epa.gov/dockets/commenting-epa-dockets.</E> <FURINF> <HD SOURCE="HED">FOR FURTHER INFORMATION CONTACT:</HD> Megan Goold, Planning & Implementation Branch (3AD30), Air & Radiation Division, U.S. Environmental Protection Agency, Region III, 1600 John F Kennedy Boulevard, Philadelphia, Pennsylvania 19103. The telephone number is (215) 814-2027. Ms. Goold can also be reached via electronic mail at <E T="03">goold.megan@epa.gov.</E> </FURINF> <SUPLINF> <HD SOURCE="HED">SUPPLEMENTARY INFORMATION:</HD> On October 5, 2023, the Pennsylvania Department of Environmental Protection (PADEP) submitted a revision to its SIP to demonstrate attainment of the 2010 SO <E T="52">2</E> NAAQS in the Indiana, PA nonattainment area. This plan includes Pennsylvania's attainment demonstration and other attainment plan elements required under the CAA, including the requirement for meeting reasonable further progress (RFP) toward attainment of the NAAQS, reasonably available control measures and reasonably available control technology (RACM/RACT), enforceable emission limitations and control measures, and contingency measures. Notably, the submission does not contain information regarding the required emissions inventory or the state's Nonattainment New Source Review (NNSR) program, as these were previously approved by the EPA (87 FR 50778, August 18, 2022). <HD SOURCE="HD1">I. Background</HD> On June 22, 2010, the EPA published a new 1-hour primary SO <E T="52">2</E> NAAQS of 75 parts per billion (ppb) at 40 CFR 50.17(a), which is met at an ambient air quality monitoring site when the 3-year average of the annual 99th percentile of daily maximum 1-hour average concentrations does not exceed 75 ppb, as determined in accordance with 40 Code of Federal Regulations (CFR) part 50 appendix T (75 FR 35520, June 22, 2010). Under CAA section 107(d)(1), the EPA is required to designate areas as “nonattainment,” “attainment,” or “unclassifiable” within two years of establishing a new or revising an existing standard. As part of this process, states must submit recommendations for area designations and boundaries to the EPA within one year of the effective date of the standard. Effective on October 4, 2013, <SU>1</SU> <FTREF/> the Indiana Area (which encompasses Indiana County, and Plumcreek Township, South Bend Township and Eldertown Borough of Armstrong County) was designated as nonattainment for the 2010 SO <E T="52">2</E> NAAQS for an area that encompasses the primary SO <E T="52">2</E> emitting sources: the Keystone Generating Station (Keystone), Conemaugh Generating Station (Conemaugh), Homer City Generating Station (Homer City), and Seward Generating Station (Seward) (hereafter referred to as “the Indiana, PA NAA”). The October 4, 2013, final designation triggered a requirement for Pennsylvania to submit by April 4, 2015 (within 18 months per CAA section 191(a)), a SIP revision with an attainment plan for how the Indiana, PA NAA would attain the 2010 SO <E T="52">2</E> NAAQS as expeditiously as practicable, but no later than October 4, 2018, (five years from the designation per CAA section 192(a)) in accordance with CAA sections 110(a), 172(c) and 191-192. <FTNT> <SU>1</SU>  78 FR 47191 (August 5, 2013). </FTNT> For a number of areas, including the Indiana, PA NAA, the EPA published a March 18, 2016 Finding of Failure to Submit, with an effective date of April 18, 2016, finding that Pennsylvania and other pertinent states had failed to submit the required SO <E T="52">2</E> attainment plan by this submittal deadline. (see 81 FR 14736, March 18, 2016). This finding initiated a deadline under CAA section 179(a) for the potential imposition of new source review and highway funding sanctions. However, as a result of Pennsylvania's October 11, 2017 submittal (hereafter referred to as “the 2017 SIP submittal”), and the EPA's subsequent October 13, 2017 letter to Pennsylvania finding the submittal complete, the CAA section 179(a) sanctions were not imposed. Additionally, under CAA section 110(c), the March 18, 2016, finding triggered a requirement that the EPA promulgate a Federal implementation plan (FIP) within two years of the effective date of the finding unless, by that time, the state has made the necessary complete submittal and the EPA has approved the submittal as meeting applicable requirements. The EPA took final action approving this attainment plan on October 19, 2020 (85 FR 66240, October 19, 2020), which removed the FIP obligation. On December 18, 2020, the Sierra Club, Clean Air Council, and Citizens for Pennsylvania's Future filed a petition for judicial review with the U.S. Court of Appeals for the Third Circuit, challenging that final approval. <SU>2</SU> <FTREF/> On April 5, 2021, the EPA filed a motion for voluntary remand without vacatur of its approval of the Indiana, PA SO <E T="52">2</E> attainment plan. <FTNT> <SU>2</SU>   <E T="03">Sierra Club, et al.</E> v. <E T="03">EPA,</E> Case No. 20-3568 (3d Cir.). </FTNT> On August 17, 2021, the U.S. Court of Appeals for the Third Circuit granted the EPA's request for remand without vacatur of the final approval of Pennsylvania's SO <E T="52">2</E> attainment plan for the Indiana, PA NAA, and required that the EPA take final action in response to the remand no later than one year from the date of the court's order. On August 18, 2022, the EPA revised and corrected its prior full approval action (85 FR 66240, October 19, 2020) without further submission from Pennsylvania (effective September 19, 2022) (87 FR 50778, August 18, 2022). Specifically, the EPA retained the approval of the emissions inventory and NNSR program requirements, and disapproved the attainment demonstration, RACM/RACT requirements, RFP requirements, and contingency measures (hereafter referred to as the “2022 Partial Approval/Partial Disapproval”) (87 FR 50778, August 18, 2022). The partial disapproval action initiated a sanctions clock under CAA section 179, providing for emission offset sanctions for new sources if EPA has not fully approved a revised attainment plan within 18 months (March 19, 2024) after final partial disapproval, and providing for highway funding sanctions if the EPA has not fully approved a revised plan within 6 months thereafter (September 19, 2024). The sanctions clock can be stopped only if the conditions of the EPA's regulations at 40 CFR 52.31 are met. Also, under CAA section 110(c), the partial disapproval action initiated an obligation for EPA to promulgate a FIP within two years unless Pennsylvania has submitted, and EPA has fully approved, a plan addressing the disapproved attainment planning requirements. On October 5, 2023, Pennsylvania submitted a 2023 SO <E T="52">2</E> Attainment Plan SIP Revision for the Indiana, PA NAA (hereafter referred to as the “2023 SIP submittal”). The 2023 SIP submittal addresses the requirements of CAA sections 172(c), 191 and 192 and the disapproved attainment planning requirements in the EPA's 2022 Partial Approval/Partial Disapproval. Specifically, this SIP revision contains a modified attainment demonstration using dispersion modeling, evaluates sources for RACT/RACM purposes, gives an RFP explanation, and provides for contingency measures, and includes revised emissions limitations and control measures. Nonattainment area SO <E T="52">2</E> SIPs must meet the applicable requirements of the CAA, specifically CAA sections 110, 172, 191 and 192. The EPA's regulations governing nonattainment area SI ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Preview showing 10k of 65k characters. Full document text is stored and available for version comparison. ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
This text is preserved for citation and comparison. View the official version for the authoritative text.