Summary:
The extension of the Rocky Mountain (RM) region's existing Loveland Area Projects (LAP) transmission and LAP, Western Area Colorado Missouri Balancing Authority (WACM), and Colorado River Storage Project (CRSP) ancillary services formula rates has been confirmed, approved, and placed into effect on an interim basis. The existing formula rates under Rate Schedules L-NT1 (network), L-FPT1 (firm point-to-point), L-NFPT1 (non-firm point-to-point), L-NFJDT (joint dispatch transmission), L-UU1 (unreserved use), L-AS1 (scheduling and dispatch), L-AS2 (reactive supply and voltage control support), L-AS3 (regulation), L-AS4 (energy imbalance), L-AS5 (spinning reserves), L-AS6 (supplemental reserves), L-AS7 (balancing authority real power losses), and L-AS9 (generator imbalance) are set to expire on September 30, 2024. This rate extension makes no changes to the existing formula rates and extends them through September 30, 2026.