← Back to FR Documents
Notice

Central Valley Project/Power, Transmission, and Ancillary Services and California-Oregon Transmission Project Transmission Service-Rate Order No. WAPA-207

Notice of rate order concerning power, transmission, and ancillary services formula rates.

📖 Research Context From Federal Register API

Summary:

The formula rates for the Sierra Nevada Region (SN) Central Valley Project (CVP) power, transmission, and ancillary services and California-Oregon Transmission Project (COTP) transmission service have been confirmed, approved, and placed into effect on an interim basis. These new formula rates replace the existing formula rates which expire on September 30, 2024, and December 31, 2024. There are no changes to the existing formula rates for these services and there are no material changes aside from updating the effective dates.

Key Dates
Citation: 89 FR 59082
The Provisional Formula Rates under Rate Schedules CV-F14, CPP- 3, CV-T4, CV-NWT6, COTP-T4, CV-TPT8, CV-UUP2, CV-SPR5, CV-SUR5, CV- RFS5, CV-EID6, CV-GID3, CV-SSP3, CV-EIM1S1, CV-EIM4S1, and CV-EIM9S1 are effective on the first day of the first full billing period beginning on or after October 1, 2024, and will remain in effect through September 30, 2029, pending confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis or until superseded.
Public Participation

Document Details

Document Number2024-16029
FR Citation89 FR 59082
TypeNotice
PublishedJul 22, 2024
Effective DateOct 1, 2024
RIN-
Docket ID-
Pages59082–59097 (16 pages)
Text FetchedNo

Agencies & CFR References

CFR References:
None

Linked CFR Parts

PartNameAgency
No linked CFR parts

Paired Documents

TypeProposedFinalMethodConf
No paired documents

External Links

Full Text

Text Not Yet Fetched

The full text for this document hasn't been fetched yet. The system will automatically retrieve it during the next processing cycle.