Summary:
The Upper Great Plains (UGP) region of the Western Area Power Administration (WAPA or Western) proposes to extend existing formula rates (without any changes) for the Pick-Sloan Missouri Basin Program-- Eastern Division (P-SMBP--ED) through September 30, 2030. The existing rates UGP proposes to extend are: WAUGP-ATRR (Annual Transmission Revenue Requirement), WAUGP-AS1 (Scheduling, System Control, and Dispatch Service), WAUW-AS3 (Regulation and Frequency Response Service), WAUW-AS4 (Energy Imbalance Service), WAUW-AS5 (Operating Reserve-Spinning Reserve Service), WAUW-AS6 (Operating Reserve- Supplemental Reserve Service), and WAUW-AS7 (Generator Imbalance Service). The existing rates expire on September 30, 2025.