← Back to FR Documents
Final Rule

Oil and Gas and Sulfur Operations in the Outer Continental Shelf-High Pressure High Temperature Updates; Correction

Final rule; correction.

📖 Research Context From Federal Register API

Summary:

BSEE is correcting a final rule that appeared in the Federal Register on August 30, 2024. BSEE is publishing a correction to fix an erroneous statement in the preamble of the final rule. BSEE inadvertently stated it did not receive public comments to an identified section of the rule. However, BSEE had received a comment associated with that section of the rule. BSEE evaluated and addressed that comment in other discussions in the preamble of the final rule.

Key Dates
Citation: 89 FR 85050
Effective October 25, 2024.
Public Participation
0 comments 3 supporting docs
View on Regulations.gov →

📋 Related Rulemaking

This final rule likely has a preceding Notice of Proposed Rulemaking (NPRM), but we haven't linked it yet.

Our system will automatically fetch and link related NPRMs as they're discovered.

Document Details

Document Number2024-24783
FR Citation89 FR 85050
TypeFinal Rule
PublishedOct 25, 2024
Effective DateOct 25, 2024
RIN1014-AA49
Docket IDDocket ID: BSEE-2021-0003
Pages85050–85051 (2 pages)
Text FetchedYes

Agencies & CFR References

CFR References:

Linked CFR Parts

PartNameAgency
No linked CFR parts

Paired Documents

TypeProposedFinalMethodConf
No paired documents

Related Documents (by RIN/Docket)

Doc #TypeTitlePublished
2024-18598 Final Rule Oil and Gas and Sulfur Operations in the... Aug 30, 2024

External Links

⏳ Requirements Extraction Pending

This document's regulatory requirements haven't been extracted yet. Extraction happens automatically during background processing (typically within a few hours of document ingestion).

Federal Register documents are immutable—once extracted, requirements are stored permanently and never need re-processing.

Full Document Text (515 words · ~3 min read)

Text Preserved
<RULE> DEPARTMENT OF THE INTERIOR <SUBAGY>Bureau of Safety and Environmental Enforcement</SUBAGY> <CFR>30 CFR Part 250</CFR> <DEPDOC>[Docket ID: BSEE-2021-0003; EEEE500000245E1700D2 ET1SF0000.EAQ000]</DEPDOC> <RIN>RIN 1014-AA49</RIN> <SUBJECT>Oil and Gas and Sulfur Operations in the Outer Continental Shelf—High Pressure High Temperature Updates; Correction</SUBJECT> <HD SOURCE="HED">AGENCY:</HD> Bureau of Safety and Environmental Enforcement (BSEE), Interior. <HD SOURCE="HED">ACTION:</HD> Final rule; correction. <SUM> <HD SOURCE="HED">SUMMARY:</HD> BSEE is correcting a final rule that appeared in the <E T="04">Federal Register</E> on August 30, 2024. BSEE is publishing a correction to fix an erroneous statement in the preamble of the final rule. BSEE inadvertently stated it did not receive public comments to an identified section of the rule. However, BSEE had received a comment associated with that section of the rule. BSEE evaluated and addressed that comment in other discussions in the preamble of the final rule. </SUM> <EFFDATE> <HD SOURCE="HED">DATES:</HD> Effective October 25, 2024. </EFFDATE> <FURINF> <HD SOURCE="HED">FOR FURTHER INFORMATION CONTACT:</HD> Kirk Malstrom, Regulations and Standards Branch, (202) 258-1518, or by email: <E T="03">regs@bsee.gov.</E> </FURINF> <SUPLINF> <HD SOURCE="HED">SUPPLEMENTARY INFORMATION:</HD> In FR Doc. 2024-18598 appearing on page 71088 in the <E T="04">Federal Register</E> of Friday, August 30, 2024, the following corrections to the preamble are made: 1. Under the heading “How must barrier systems be used (§ 250.207)”, which begins near the bottom of the third column on page 71087, the text under the subheading “Summary of Final Rule Revisions”, which begins near the top of the first column on page 71088, is corrected to read: BSEE received and considered a comment regarding proposed § 250.207 and includes the proposed language in the final rule without change. <E T="03">Summary of Comment:</E> A commenter expressed concerns with the applicability of this section to existing blowout preventer barrier system requirements and asked if new and unusual technology can be a barrier. The commenter also suggested that BSEE include capabilities for one specific type of barrier that can shear and seal pipe used for certain well operations. <E T="03">Response:</E> As discussed in this section and other sections of the final rule preamble, this section would not alter or impact any existing regulations (see summary of proposed rule revisions for this section). BSEE also stated that the New or Unusual Technology Barrier Equipment Conceptual Plan requirements apply to new or unusual technology “that is identified” as barrier equipment (see final rule preamble section III for § 250.201). Operators that use new or unusual technology identified as a barrier must comply with the applicable requirements of this final rule ( <E T="03">e.g.,</E> see §§ 250.201, 250.207, and 250.229). BSEE disagrees that changes to this section are necessary. This section does not identify any specific types of barriers, and BSEE's intent is not to limit the use of new or unusual technology by including specific operating capabilities that may not be applicable to all barriers (see final rule preamble section III for § 250.206). This action by the Principal Deputy Assistant Secretary is taken pursuant to an existing delegation of authority. <SIG> <NAME>Steven H. Feldgus,</NAME> Principal Deputy Assistant Secretary, Land and Minerals Management. </SIG> </SUPLINF> <FRDOC>[FR Doc. 2024-24783 Filed 10-24-24; 8:45 am]</FRDOC> </RULE>
This text is preserved for citation and comparison. View the official version for the authoritative text.