← All FR Documents ·← Back to 2026-00932
Proposed Rule

Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Beach, FL

In Plain English

What is this Federal Register notice?

This is a proposed rule published in the Federal Register by Homeland Security Department, Coast Guard. Proposed rules invite public comment before becoming final, legally binding regulations.

Is this rule final?

No. This is a proposed rule. It has not yet been finalized and is subject to revision based on public comments.

Who does this apply to?

Consult the full text of this document for specific applicability provisions. The affected parties depend on the regulatory scope defined within.

When does it take effect?

No specific effective date is indicated. Check the full text for date provisions.

📋 Rulemaking Status

This is a proposed rule. A final rule may be issued after the comment period and agency review.

Regulatory History — 64 documents in this rulemaking

  1. Jan 24, 2024 2024-01359 Final Rule
    Drawbridge Operation Regulation; Housatonic River, Stratford, CT
  2. Jan 24, 2024 2024-01358 Final Rule
    Drawbridge Operation Regulation; Saugatuck River, Westport, CT
  3. Jan 24, 2024 2024-01360 Final Rule
    Drawbridge Operation Regulation; Mianus River, Greenwich, CT
  4. Feb 2, 2024 2024-02084 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Jupiter, FL
  5. Feb 5, 2024 2024-02187 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  6. Feb 21, 2024 2024-03455 Proposed Rule
    Drawbridge Operation Regulation; Reynolds Channel, Atlantic Beach, NY
  7. Feb 23, 2024 2024-03462 Final Rule
    Drawbridge Operation Regulation; Sloop Channel, Nassau County, NY
  8. Feb 23, 2024 2024-03463 Final Rule
    Drawbridge Operation Regulation; Long Creek, Nassau County, NY
  9. Feb 29, 2024 2024-04274 Final Rule
    Drawbridge Operation Regulation; Ashtabula River, Ashtabula, OH
  10. Feb 29, 2024 2024-04273 Final Rule
    Drawbridge Operation Regulation; River Rouge, Detroit, MI; Correction
  11. Mar 8, 2024 2024-05007 Final Rule
    Drawbridge Operation Regulation; Old River, Between Victoria Island and Byron...
  12. Mar 8, 2024 2024-04952 Final Rule
    Drawbridge Operation Regulation; Portage River, Port Clinton, OH
  13. Apr 8, 2024 2024-07366 Proposed Rule
    Drawbridge Operation Regulation; Milwaukee, Menomonee, and Kinnikinnic Rivers...
  14. Apr 8, 2024 2024-07368 Final Rule
    Drawbridge Operation Regulation; Black River, Lorain, OH
  15. Apr 8, 2024 2024-07367 Final Rule
    Drawbridge Operation Regulation; Maumee River, Toledo, OH
  16. Apr 10, 2024 2024-07578 Proposed Rule
    Drawbridge Operation Regulation; Umpqua River, Reedsport, OR
  17. May 7, 2024 2024-09922 Final Rule
    Drawbridge Operation Regulation; Reynolds Channel, Atlantic Beach, NY
  18. May 20, 2024 2024-10980 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Be...
  19. May 28, 2024 2024-11608 Final Rule
    Drawbridge Operation Regulation; Cuyahoga River, Cleveland, OH
  20. May 31, 2024 2024-11837 Final Rule
    Drawbridge Operation Regulation; Sloop Channel, Nassau County, NY
  21. Jun 21, 2024 2024-13472 Proposed Rule
    Drawbridge Operation Regulation; Townsend Gut, Southport, ME
  22. Jul 2, 2024 2024-14545 Final Rule
    Drawbridge Operation Regulation; Three Mile Slough, Near Rio Vista, CA
  23. Jul 15, 2024 2024-15233 Proposed Rule
    Drawbridge Operation Regulation; Miami River, North Fork, Miami, FL
  24. Jul 31, 2024 2024-16824 Proposed Rule
    Drawbridge Operation Regulation; Rancocas Creek, Burlington County, NJ
  25. Aug 7, 2024 2024-17452 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  26. Sep 3, 2024 2024-19697 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL; Correction
  27. Sep 26, 2024 2024-21971 Final Rule
    Drawbridge Operation Regulation; Milwaukee, Menomonee, and Kinnikinnic Rivers...
  28. Oct 3, 2024 2024-22822 Proposed Rule
    Drawbridge Operation Regulation; Hackensack River, Little Snake Hill, NJ
  29. Oct 15, 2024 2024-23769 Final Rule
    Drawbridge Operation Regulation; Wappinger Creek, New Hamburg, New York
  30. Oct 16, 2024 2024-23738 Final Rule
    Drawbridge Operation Regulation; Townsend Gut, Southport, ME
  31. Oct 25, 2024 2024-24711 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Jupiter, FL
  32. Oct 25, 2024 2024-24847 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Beaufort, SC
  33. Oct 30, 2024 2024-24970 Final Rule
    Drawbridge Operation Regulation; Dutch Kills, Queens County, NY
  34. Nov 4, 2024 2024-25603 Final Rule
    Drawbridge Operation Regulation; Sacramento River, Rio Vista, CA
  35. Nov 6, 2024 2024-25660 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Be...
  36. Jan 8, 2025 2024-31328 Proposed Rule
    Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Osprey, FL
  37. Jan 17, 2025 2025-00573 Final Rule
    Drawbridge Operation Regulation; Umpqua River, Reedsport, OR
  38. Feb 7, 2025 2025-02368 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  39. Mar 24, 2025 2025-04917 Final Rule
    Drawbridge Operation Regulation; Sandusky Bay, Sandusky, OH
  40. Mar 25, 2025 2025-04918 Proposed Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  41. Mar 26, 2025 2025-05091 Final Rule
    Drawbridge Operation Regulation; Hackensack River, Little Snake Hill, NJ
  42. Apr 4, 2025 2025-05748 Final Rule
    Drawbridge Operation Regulation; Miami River, North Fork, Miami, FL
  43. Apr 4, 2025 2025-05778 Final Rule
    Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Osprey, FL
  44. Apr 7, 2025 2025-05875 Final Rule
    Drawbridge Operation Regulation; Honker Cut, Between Empire Tract and King Is...
  45. Apr 17, 2025 2025-06394 Final Rule
    Drawbridge Operation Regulation; Passaic River, Harrison, New Jersey
  46. Apr 24, 2025 2025-07058 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Be...
  47. May 19, 2025 2025-08888 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL; Extension o...
  48. May 20, 2025 2025-08990 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Beaufort, SC
  49. Jun 9, 2025 2025-10418 Proposed Rule
    Drawbridge Operation Regulation; Inside Thorofare, Ventnor City, New Jersey
  50. Jun 23, 2025 2025-11495 Final Rule
    Drawbridge Operation Regulation; East River, Green Bay, WI
  51. Jul 24, 2025 2025-13882 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Fort Lauderd...
  52. Aug 1, 2025 2025-14593 Final Rule
    Drawbridge Operation Regulation; Southern Branch of the Elizabeth River, Ches...
  53. Sep 9, 2025 2025-17302 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, North Myrtle...
  54. Sep 16, 2025 2025-17888 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  55. Oct 1, 2025 2025-19114 Final Rule
    Drawbridge Operation Regulation; Canaveral Barge Canal, Port Canaveral, FL
  56. Nov 18, 2025 2025-20164 Proposed Rule
    Drawbridge Operation Regulation; Newark Bay, Between the City of Newark and C...
  57. Nov 24, 2025 2025-20726 Final Rule
    Drawbridge Operation Regulation; Bass River, Beverly, MA
  58. Nov 26, 2025 2025-21198 Proposed Rule
    Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA
  59. Dec 1, 2025 2025-21670 Proposed Rule
    Drawbridge Operation Regulation; Passaic River, Between the City of Newark an...
  60. Jan 20, 2026 2026-00931 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, North Myrtle...
  61. Jan 20, 2026 2026-00932 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Fort Lauderd...
  62. Jan 26, 2026 2026-01398 Final Rule
    Drawbridge Operation Regulation; Inside Thorofare, Ventnor City, New Jersey
  63. Jan 26, 2026 2026-01400 Final Rule
    Drawbridge Operation Regulation; Technical Amendment; Removal of Obsolete Dra...
  64. Feb 3, 2026 2026-02175 Final Rule
    Drawbridge Operation Regulation; New Rochelle Harbor, Westchester County, NY

Document Details

Document Number2024-25660
TypeProposed Rule
PublishedNov 6, 2024
Effective Date-
RIN1625-AA09
Docket IDDocket No. USCG-2023-0601
Text FetchedYes

Agencies & CFR References

CFR References:

Linked CFR Parts

PartNameAgency
No linked CFR parts

Paired Documents

TypeProposedFinalMethodConf
No paired documents

Related Documents (by RIN/Docket)

Doc #TypeTitlePublished
2026-02175 Final Rule Drawbridge Operation Regulation; New Roc... Feb 3, 2026
2026-01398 Final Rule Drawbridge Operation Regulation; Inside ... Jan 26, 2026
2026-01400 Final Rule Drawbridge Operation Regulation; Technic... Jan 26, 2026
2026-00931 Final Rule Drawbridge Operation Regulation; Atlanti... Jan 20, 2026
2026-00932 Final Rule Drawbridge Operation Regulation; Atlanti... Jan 20, 2026
2025-21670 Proposed Rule Drawbridge Operation Regulation; Passaic... Dec 1, 2025
2025-21198 Proposed Rule Drawbridge Operation Regulation; Wishkah... Nov 26, 2025
2025-20726 Final Rule Drawbridge Operation Regulation; Bass Ri... Nov 24, 2025
2025-20164 Proposed Rule Drawbridge Operation Regulation; Newark ... Nov 18, 2025
2025-19114 Final Rule Drawbridge Operation Regulation; Canaver... Oct 1, 2025

External Links

⏳ Requirements Extraction Pending

This document's regulatory requirements haven't been extracted yet. Extraction happens automatically during background processing (typically within a few hours of document ingestion).

Federal Register documents are immutable—once extracted, requirements are stored permanently and never need re-processing.

Full Document Text (2,961 words · ~15 min read)

Text Preserved
DEPARTMENT OF HOMELAND SECURITY <SUBAGY>Coast Guard</SUBAGY> <CFR>33 CFR Part 117</CFR> <DEPDOC>[Docket No. USCG-2023-0601]</DEPDOC> <RIN>RIN 1625-AA09</RIN> <SUBJECT>Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Beach, FL</SUBJECT> <HD SOURCE="HED">AGENCY:</HD> Coast Guard, DHS. <HD SOURCE="HED">ACTION:</HD> Supplemental notice of proposed rulemaking. <SUM> <HD SOURCE="HED">SUMMARY:</HD> The Coast Guard proposes to modify the operating schedule that governs the Flagler Memorial (SR A1A) Bridge, mile 1021.8, the Royal Park (SR 704) Bridge, mile 1022.6, and the Southern Boulevard (SR 700/80) Bridge, mile 1024.7, across Atlantic Intracoastal Waterway (AICW), at West Palm Beach, FL. Palm Beach County and the communities surrounding the bridges have requested the Coast Guard consider placing additional weekday restrictions during peak traffic hours to assist with alleviating vehicle congestion. This proposed modification will allow the drawbridges to operate in concert and determine whether a permanent change to the schedules is needed. We invite your comments on this proposed rulemaking. </SUM> <EFFDATE> <HD SOURCE="HED">DATES:</HD> Comments and related material must reach the Coast Guard on or before December 6, 2024. </EFFDATE> <HD SOURCE="HED">ADDRESSES:</HD> You may submit comments identified by docket number USCG-2023-0601 using Federal Decision Making Portal at <E T="03">https://www.regulations.gov.</E> See the “Public Participation and Request for Comments” portion of the <E T="02">SUPPLEMENTARY INFORMATION</E> section below for instructions on submitting comments. This notice of proposed rulemaking with its plain-language, 100-word-or-less proposed rule summary will be available in this same docket. <FURINF> <HD SOURCE="HED">FOR FURTHER INFORMATION CONTACT:</HD> If you have questions on this supplemental proposed rule, call or email Ms. Jennifer Zercher, Bridge Management Specialist, Seventh Coast Guard District; telephone (571) 607-5951, email <E T="03">Jennifer.N.Zercher@uscg.mil.</E> </FURINF> <SUPLINF> <HD SOURCE="HED">SUPPLEMENTARY INFORMATION:</HD> <HD SOURCE="HD1">I. Table of Abbreviations </HD> <EXTRACT> <FP SOURCE="FP-1">CFR Code of Federal Regulations</FP> <FP SOURCE="FP-1">DHS Department of Homeland Security</FP> <FP SOURCE="FP-1">FR Federal Register</FP> <FP SOURCE="FP-1">NPRM Notice of proposed rulemaking</FP> <FP SOURCE="FP-1">SNPRM Supplemental Notice of Proposed Rulemaking</FP> <FP SOURCE="FP-1">ANPRM Advance Notice of Proposed Rulemaking</FP> <FP SOURCE="FP-1">Pub. L. Public Law</FP> <FP SOURCE="FP-1">§ Section </FP> <FP SOURCE="FP-1">U.S.C. United States Code</FP> <FP SOURCE="FP-1">TD Temporary Deviation</FP> <FP SOURCE="FP-1">AICW Atlantic Intracoastal Waterway</FP> <FP SOURCE="FP-1">FDOT Florida Department of Transportation</FP> </EXTRACT> <HD SOURCE="HD1">II. Background, Purpose and Legal Basis</HD> On July 31, 2023, the Coast Guard published a temporary deviation entitled “Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, West Palm Beach, FL” in the <E T="04">Federal Register</E> (88 FR 49287). The comment period ended September 29, 2023, with 529 comments received. Those comments were addressed in the NPRM. On May 20, 2024, we published a NPRM entitled “Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, West Palm Beach, FL” in the <E T="04">Federal Register</E> (89 FR 43797). The comment period ended June 20, 2024, with 1,153 comments received. Those comments will be addressed in section III. The Flagler Memorial (SR A1A) Bridge, across the AICW, mile 1021.8, at West Palm Beach, FL is a double-leaf bascule bridge with a 24-foot vertical clearance at mean high water in the closed position. The normal operating schedule is set forth in 33 CFR 117.261(u). The Royal Park (SR 704) Bridge, across the AICW, mile 1022.6, at West Palm Beach, FL is a double-leaf bascule bridge with a 21-foot vertical clearance at mean high water in the closed position. The normal operating schedule is set forth in 33 CFR 117.261(v). The Southern Boulevard (SR 700/80) Bridge, across the AICW, mile 1024.7, at West Palm Beach, FL is a double-leaf bascule bridge with a 25-foot vertical clearance at mean high water in the closed position. The normal operating schedule is set forth in 33 CFR 117.261(w). Palm Beach County and the communities surrounding the bridges have requested the Coast Guard consider placing additional weekday restrictions during peak traffic hours to assist with alleviating vehicle congestion. Vehicle traffic across these bridges is exceeding the roadway capacity during certain times of the day. The Coast Guard is proposing to limit drawbridge openings during high vehicle traffic times to assist with vehicle congestion while requesting state and local agencies consider alternate mitigation measures to improve traffic flow and roadway congestion. The drawbridges will open twice an hour at all other times or as outlined in each drawbridge operating regulation. <HD SOURCE="HD1">III. Discussion of Comments and Change</HD> Many of the comments received from the NPRM were similar to comments received during the temporary deviation. A total of 811 comments supported the proposed changes and included generic comments, such as “I support” or “I support this initiative.” The second highest group included 150 commentors who proposed alternate operating schedules. Those proposed alternate schedules included not opening during rush hour, only open once an hour always and changing the morning and afternoon rush hour times to various other intervals. The designated times included in the rule proposal to allow the drawbridge to open on the hour during rush hour was previously determined by local authorities. The Coast Guard feels that a modification to those time periods is not necessary because the blocks of time presented have been determined to be the best use of hourly openings. To allow the drawbridge to remain closed to navigation during the designated times or to only open once an hour always would result in an unreasonable obstruction to navigation on this waterway. The AICW is a Federal Project Waterway extending over 1,500 miles from Boston to Florida Bay. It is the main waterway artery for all recreational and commercial traffic that are unable to safely transit offshore. The Coast Guard has the responsibility to ensure reasonable access to this waterway is maintained. Allowing the bridges to remain closed to navigation or open only once an hour always would be contrary to our responsibility. We received 137 comments that were either outside the scope of the NPRM and/or did not provide an opinion on the proposed rule. Instead, the comments discussed adjacent drawbridges and school zones in the area. A total of 23 comments were against the proposed changes. Most felt that no change was needed as marine traffic was already placed on scheduled openings. The Coast Guard recognizes that vehicle traffic in the area appears to exceed roadway capacity, causing vehicle congestion. Placing additional weekday restrictions during peak traffic hours should assist with alleviating vehicle congestion. Other commentors stated that further limiting openings for marine traffic would cause longer delays when the bridge opened. Their concern was that more vessels would be waiting which in turn would increase the overall opening time. This action can be an unintended consequence of placing drawbridges on scheduled openings. The last concern was the proposed change would have an impact on charter and catamaran businesses in the area. The Coast Guard feels that the limited time the bridge will open once an hour will meet the reasonable needs of navigation. Lastly, 32 comments were duplicates and not considered actionable. It was discovered the Royal Park (SR 704) Bridge proposed schedule change conflicted with the operating schedule when the Mar-a-Lago Security Zone was being enforced. An explanation of the change is provided in the below section. <HD SOURCE="HD1">IV. Discussion of Proposed Rule</HD> In the NPRM we proposed to modify the drawbridge operating schedules for the three bridges to allow once an hour openings Monday through Friday, from 7:30 a.m. to 9 a.m. and from 4 p.m. to 6 p.m. However, the proposed change for the Royal Park (SR 704) Bridge shifted the hourly opening from the half hour to the three-quarter hour. This shift did not take into consideration the alternate operating schedule authorized for the bridge when the Mar-a-Lago Security Zone is being enforced. We are proposing the Royal Park (SR 704) Bridge be placed back on the half hour opening schedule with no changes to the proposed operating schedules for the Flagler Memorial (SR A1A) and Southern Boulevard (SR 80) Bridges. Additionally, the operating schedules for Flagler Memorial (SR A1A) and Royal Park (SR 704) Bridges during the enforcement of the Mar-a-Lago Security Zone has been updated to show the proposed rule change. <HD SOURCE="HD1">V. Regulatory Analyses</HD> We developed this proposed rule after considering numerous statutes and Executive Orders related to rulemaking. Below we summarize our analyses based on these statutes and Executive Orders. <HD SOURCE="HD2">A. Regulatory Planning and Review</HD> Executive Orders 12866 and 13563 direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits. This proposed rule has not been designated a “significant regulatory action,” under section 3(f) of Executive Order 12866, as amended by Executive Order 14094 (Modernizing Regulatory Review). Accordingly, the NPRM has not been reviewed by the Office of Management and Budget (OMB). This regulatory action determination is based on the ability that vesse ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Preview showing 10k of 20k characters. Full document text is stored and available for version comparison. ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
This text is preserved for citation and comparison. View the official version for the authoritative text.