Southern California Edison Company; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

In Plain English

What is this Federal Register notice?

This is a notice published in the Federal Register by Energy Department, Federal Energy Regulatory Commission. Notices communicate information, guidance, or policy interpretations but may not create new binding obligations.

Is this rule final?

This document is classified as a notice. It may or may not create enforceable regulatory obligations depending on its specific content.

Who does this apply to?

Consult the full text of this document for specific applicability provisions. The affected parties depend on the regulatory scope defined within.

When does it take effect?

No specific effective date is indicated. Check the full text for date provisions.

Why it matters: This notice communicates agency policy or guidance regarding applicable regulations.

Document Details

Document Number2025-02473
TypeNotice
PublishedFeb 11, 2025
Effective Date-
RIN-
Docket IDProject No. 1389-060
Text FetchedYes

Agencies & CFR References

CFR References:
None

Linked CFR Parts

PartNameAgency
No linked CFR parts

Paired Documents

TypeProposedFinalMethodConf
No paired documents

Related Documents (by RIN/Docket)

Doc #TypeTitlePublished
2025-22736 Notice Southern California Edison Company; Noti... Dec 15, 2025

External Links

⏳ Requirements Extraction Pending

This document's regulatory requirements haven't been extracted yet. Extraction happens automatically during background processing (typically within a few hours of document ingestion).

Federal Register documents are immutable—once extracted, requirements are stored permanently and never need re-processing.

Full Document Text (773 words · ~4 min read)

Text Preserved
<NOTICE> DEPARTMENT OF ENERGY <SUBAGY>Federal Energy Regulatory Commission</SUBAGY> <DEPDOC>[Project No. 1389-060]</DEPDOC> <SUBJECT>Southern California Edison Company; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments</SUBJECT> Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. <E T="03">Type of Application:</E> New Major License. b. <E T="03">Project No.:</E> 1389-060. c. <E T="03">Date Filed:</E> January 22, 2025. d. <E T="03">Applicant:</E> Southern California Edison Company (SCE). e. <E T="03">Name of Project:</E> Rush Creek Hydroelectric Project (project). f. <E T="03">Location:</E> The project is located on Rush Creek near the unincorporated community of June Lake in Mono County, California. g. <E T="03">Filed Pursuant to:</E> Federal Power Act, 16 U.S.C. 791(a)-825(r). h. <E T="03">Applicant Contact:</E> Matthew Woodhall, Relicensing Project Manager, SCE at (909) 362-1764 or <E T="03">matthew.woodhall@sce.com.</E> i. <E T="03">FERC Contact:</E> Quinn Emmering, Project Coordinator at (202) 502-6382 or <E T="03">quinn.emmering@ferc.gov.</E> j. The application is not ready for environmental analysis at this time. k. <E T="03">Project Description:</E> The project is located primarily on federal lands within Inyo National Forest and the Ansel Adams Wilderness Area, both administered by the U.S. Department of Agriculture, Forest Service. Existing project facilities include: (1) the 50-foot-high, 463-foot-long Rush Meadows Dam impounding the 130-acre Waugh Lake; (2) the 84-foot-high, 688-foot-long Gem Dam impounding 256-acre Gem Lake; (3) the 30-foot-high, 278-foot-long Agnew Dam impounding 23-acre Agnew Lake; (4) a water conveyance system consisting of an approximately 4,584-foot-long buried steel flowline conveying water from Gem Dam to Agnew Junction, a 575-foot-long steel flowline from Agnew Dam to the Agnew valve house, and two 4,280-foot-long buried steel penstocks; (5) a powerhouse containing two impulse turbines and two horizontal-shaft generator units; (6) a 470-foot-long tailrace conveying water from the powerhouse to Rush Creek; (7) a 1.59-mile-long, 4-kilovolt (kV) power line, half of which is de-energized for future repairs; (8) a 150-foot-long, 2.4-kV power line; (9) an approximately 1.63-mile-long communication line; (10) incline railroads (tramways) used to transport personnel and equipment, including a 1,490-foot-long tramway from Agnew Lake to Gem Dam and a 4,280-foot-long tramway from the project powerhouse to Agnew Dam; (11) about 1,860 feet of trails to access project facilities; and (12) ancillary facilities. The project does not include any developed recreation facilities. SCE proposes to: (1) decommission hydroelectric operations at Rush Meadows Dam and Agnew Dam, including partial removal of the two dams; (2) retrofit Gem Dam with a new spillway and reduce the height of the dam to facilitate compliance with seismic restrictions under a probable maximum flood event; and (3) continue hydroelectric operations at Gem Dam and the project powerhouse. SCE does not propose any additional generation capacity or new project facilities. l. In addition to publishing this notice in the <E T="04">Federal Register</E> , the Commission provides all interested persons an opportunity to view and/or print the contents of this notice, as well as other documents in the proceeding ( <E T="03">e.g.,</E> license application) via the internet through the Commission's Home Page ( <E T="03">http://www.ferc.gov</E> ), using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field to access the document (P-1389). For assistance, contact FERC at <E T="03">FERCOnlineSupport@ferc.gov,</E> (866) 208-3676 (toll free), or (202) 502-8659 (TTY). You may also register online at <E T="03">https://ferconline.ferc.gov/FERCOnline.aspx</E> to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. m. The Commission's Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, community organizations, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502-6595, or <E T="03">OPP@ferc.gov.</E> n. <E T="03">Procedural Schedule:</E> The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. <FP SOURCE="FP-1">Deficiency Letter (if necessary)—February 2025</FP> <FP SOURCE="FP-1">Additional Information Request (if necessary)—April 2025</FP> <FP SOURCE="FP-1">Notice of Acceptance—September 2025</FP> <FP SOURCE="FP-1">Issue Notice of Ready for Environmental Analysis—September 2025</FP> <FP SOURCE="FP-1">Filing of recommendations, preliminary terms and conditions, and fishway prescriptions—November 2025</FP> <FP SOURCE="FP-1">Commission issues Draft EA—May 2026</FP> <FP SOURCE="FP-1">Comments on Draft EA—June 2026</FP> <FP SOURCE="FP-1">Commission issues Final EA—December 2026</FP> o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. <SIG> <DATED>Dated: February 5, 2025.</DATED> <NAME>Debbie-Anne A. Reese,</NAME> Secretary. </SIG> <FRDOC>[FR Doc. 2025-02473 Filed 2-10-25; 8:45 am]</FRDOC> </NOTICE>
This text is preserved for citation and comparison. View the official version for the authoritative text.