← All FR Documents ·← Back to 2024-02084
Proposed Rule

Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL

In Plain English

What is this Federal Register notice?

This is a proposed rule published in the Federal Register by Homeland Security Department, Coast Guard. Proposed rules invite public comment before becoming final, legally binding regulations.

Is this rule final?

No. This is a proposed rule. It has not yet been finalized and is subject to revision based on public comments.

Who does this apply to?

Consult the full text of this document for specific applicability provisions. The affected parties depend on the regulatory scope defined within.

When does it take effect?

No specific effective date is indicated. Check the full text for date provisions.

📋 Rulemaking Status

This is a proposed rule. A final rule may be issued after the comment period and agency review.

Regulatory History — 64 documents in this rulemaking

  1. Jan 24, 2024 2024-01359 Final Rule
    Drawbridge Operation Regulation; Housatonic River, Stratford, CT
  2. Jan 24, 2024 2024-01358 Final Rule
    Drawbridge Operation Regulation; Saugatuck River, Westport, CT
  3. Jan 24, 2024 2024-01360 Final Rule
    Drawbridge Operation Regulation; Mianus River, Greenwich, CT
  4. Feb 2, 2024 2024-02084 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Jupiter, FL
  5. Feb 5, 2024 2024-02187 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  6. Feb 21, 2024 2024-03455 Proposed Rule
    Drawbridge Operation Regulation; Reynolds Channel, Atlantic Beach, NY
  7. Feb 23, 2024 2024-03462 Final Rule
    Drawbridge Operation Regulation; Sloop Channel, Nassau County, NY
  8. Feb 23, 2024 2024-03463 Final Rule
    Drawbridge Operation Regulation; Long Creek, Nassau County, NY
  9. Feb 29, 2024 2024-04274 Final Rule
    Drawbridge Operation Regulation; Ashtabula River, Ashtabula, OH
  10. Feb 29, 2024 2024-04273 Final Rule
    Drawbridge Operation Regulation; River Rouge, Detroit, MI; Correction
  11. Mar 8, 2024 2024-05007 Final Rule
    Drawbridge Operation Regulation; Old River, Between Victoria Island and Byron...
  12. Mar 8, 2024 2024-04952 Final Rule
    Drawbridge Operation Regulation; Portage River, Port Clinton, OH
  13. Apr 8, 2024 2024-07366 Proposed Rule
    Drawbridge Operation Regulation; Milwaukee, Menomonee, and Kinnikinnic Rivers...
  14. Apr 8, 2024 2024-07368 Final Rule
    Drawbridge Operation Regulation; Black River, Lorain, OH
  15. Apr 8, 2024 2024-07367 Final Rule
    Drawbridge Operation Regulation; Maumee River, Toledo, OH
  16. Apr 10, 2024 2024-07578 Proposed Rule
    Drawbridge Operation Regulation; Umpqua River, Reedsport, OR
  17. May 7, 2024 2024-09922 Final Rule
    Drawbridge Operation Regulation; Reynolds Channel, Atlantic Beach, NY
  18. May 20, 2024 2024-10980 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Be...
  19. May 28, 2024 2024-11608 Final Rule
    Drawbridge Operation Regulation; Cuyahoga River, Cleveland, OH
  20. May 31, 2024 2024-11837 Final Rule
    Drawbridge Operation Regulation; Sloop Channel, Nassau County, NY
  21. Jun 21, 2024 2024-13472 Proposed Rule
    Drawbridge Operation Regulation; Townsend Gut, Southport, ME
  22. Jul 2, 2024 2024-14545 Final Rule
    Drawbridge Operation Regulation; Three Mile Slough, Near Rio Vista, CA
  23. Jul 15, 2024 2024-15233 Proposed Rule
    Drawbridge Operation Regulation; Miami River, North Fork, Miami, FL
  24. Jul 31, 2024 2024-16824 Proposed Rule
    Drawbridge Operation Regulation; Rancocas Creek, Burlington County, NJ
  25. Aug 7, 2024 2024-17452 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  26. Sep 3, 2024 2024-19697 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL; Correction
  27. Sep 26, 2024 2024-21971 Final Rule
    Drawbridge Operation Regulation; Milwaukee, Menomonee, and Kinnikinnic Rivers...
  28. Oct 3, 2024 2024-22822 Proposed Rule
    Drawbridge Operation Regulation; Hackensack River, Little Snake Hill, NJ
  29. Oct 15, 2024 2024-23769 Final Rule
    Drawbridge Operation Regulation; Wappinger Creek, New Hamburg, New York
  30. Oct 16, 2024 2024-23738 Final Rule
    Drawbridge Operation Regulation; Townsend Gut, Southport, ME
  31. Oct 25, 2024 2024-24711 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Jupiter, FL
  32. Oct 25, 2024 2024-24847 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Beaufort, SC
  33. Oct 30, 2024 2024-24970 Final Rule
    Drawbridge Operation Regulation; Dutch Kills, Queens County, NY
  34. Nov 4, 2024 2024-25603 Final Rule
    Drawbridge Operation Regulation; Sacramento River, Rio Vista, CA
  35. Nov 6, 2024 2024-25660 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Be...
  36. Jan 8, 2025 2024-31328 Proposed Rule
    Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Osprey, FL
  37. Jan 17, 2025 2025-00573 Final Rule
    Drawbridge Operation Regulation; Umpqua River, Reedsport, OR
  38. Feb 7, 2025 2025-02368 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  39. Mar 24, 2025 2025-04917 Final Rule
    Drawbridge Operation Regulation; Sandusky Bay, Sandusky, OH
  40. Mar 25, 2025 2025-04918 Proposed Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  41. Mar 26, 2025 2025-05091 Final Rule
    Drawbridge Operation Regulation; Hackensack River, Little Snake Hill, NJ
  42. Apr 4, 2025 2025-05748 Final Rule
    Drawbridge Operation Regulation; Miami River, North Fork, Miami, FL
  43. Apr 4, 2025 2025-05778 Final Rule
    Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Osprey, FL
  44. Apr 7, 2025 2025-05875 Final Rule
    Drawbridge Operation Regulation; Honker Cut, Between Empire Tract and King Is...
  45. Apr 17, 2025 2025-06394 Final Rule
    Drawbridge Operation Regulation; Passaic River, Harrison, New Jersey
  46. Apr 24, 2025 2025-07058 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway; West Palm Be...
  47. May 19, 2025 2025-08888 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL; Extension o...
  48. May 20, 2025 2025-08990 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Beaufort, SC
  49. Jun 9, 2025 2025-10418 Proposed Rule
    Drawbridge Operation Regulation; Inside Thorofare, Ventnor City, New Jersey
  50. Jun 23, 2025 2025-11495 Final Rule
    Drawbridge Operation Regulation; East River, Green Bay, WI
  51. Jul 24, 2025 2025-13882 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Fort Lauderd...
  52. Aug 1, 2025 2025-14593 Final Rule
    Drawbridge Operation Regulation; Southern Branch of the Elizabeth River, Ches...
  53. Sep 9, 2025 2025-17302 Proposed Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, North Myrtle...
  54. Sep 16, 2025 2025-17888 Final Rule
    Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL
  55. Oct 1, 2025 2025-19114 Final Rule
    Drawbridge Operation Regulation; Canaveral Barge Canal, Port Canaveral, FL
  56. Nov 18, 2025 2025-20164 Proposed Rule
    Drawbridge Operation Regulation; Newark Bay, Between the City of Newark and C...
  57. Nov 24, 2025 2025-20726 Final Rule
    Drawbridge Operation Regulation; Bass River, Beverly, MA
  58. Nov 26, 2025 2025-21198 Proposed Rule
    Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA
  59. Dec 1, 2025 2025-21670 Proposed Rule
    Drawbridge Operation Regulation; Passaic River, Between the City of Newark an...
  60. Jan 20, 2026 2026-00931 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, North Myrtle...
  61. Jan 20, 2026 2026-00932 Final Rule
    Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Fort Lauderd...
  62. Jan 26, 2026 2026-01398 Final Rule
    Drawbridge Operation Regulation; Inside Thorofare, Ventnor City, New Jersey
  63. Jan 26, 2026 2026-01400 Final Rule
    Drawbridge Operation Regulation; Technical Amendment; Removal of Obsolete Dra...
  64. Feb 3, 2026 2026-02175 Final Rule
    Drawbridge Operation Regulation; New Rochelle Harbor, Westchester County, NY

Document Details

Document Number2025-04918
TypeProposed Rule
PublishedMar 25, 2025
Effective Date-
RIN1625-AA09
Docket IDDocket No. USCG-2022-0222
Text FetchedYes

Agencies & CFR References

CFR References:

Linked CFR Parts

PartNameAgency
No linked CFR parts

Paired Documents

TypeProposedFinalMethodConf
No paired documents

Related Documents (by RIN/Docket)

Doc #TypeTitlePublished
2026-02175 Final Rule Drawbridge Operation Regulation; New Roc... Feb 3, 2026
2026-01398 Final Rule Drawbridge Operation Regulation; Inside ... Jan 26, 2026
2026-01400 Final Rule Drawbridge Operation Regulation; Technic... Jan 26, 2026
2026-00931 Final Rule Drawbridge Operation Regulation; Atlanti... Jan 20, 2026
2026-00932 Final Rule Drawbridge Operation Regulation; Atlanti... Jan 20, 2026
2025-21670 Proposed Rule Drawbridge Operation Regulation; Passaic... Dec 1, 2025
2025-21198 Proposed Rule Drawbridge Operation Regulation; Wishkah... Nov 26, 2025
2025-20726 Final Rule Drawbridge Operation Regulation; Bass Ri... Nov 24, 2025
2025-20164 Proposed Rule Drawbridge Operation Regulation; Newark ... Nov 18, 2025
2025-19114 Final Rule Drawbridge Operation Regulation; Canaver... Oct 1, 2025

External Links

⏳ Requirements Extraction Pending

This document's regulatory requirements haven't been extracted yet. Extraction happens automatically during background processing (typically within a few hours of document ingestion).

Federal Register documents are immutable—once extracted, requirements are stored permanently and never need re-processing.

Full Document Text (3,761 words · ~19 min read)

Text Preserved
DEPARTMENT OF HOMELAND SECURITY <SUBAGY>Coast Guard</SUBAGY> <CFR>33 CFR Part 117</CFR> <DEPDOC>[Docket No. USCG-2022-0222]</DEPDOC> <RIN>RIN 1625-AA09</RIN> <SUBJECT>Drawbridge Operation Regulation; Okeechobee Waterway, Stuart, FL</SUBJECT> <HD SOURCE="HED">AGENCY:</HD> Coast Guard, DHS. <HD SOURCE="HED">ACTION:</HD> Notice of proposed rulemaking. <SUM> <HD SOURCE="HED">SUMMARY:</HD> The Coast Guard proposes to modify the operating schedule that governs the Florida East Coast (FEC) Railroad Bridge, across the Okeechobee Waterway (OWW), mile 7.41, at Stuart, FL. This proposed rule will allow the drawbridge to operate on a more predictable and reliable schedule to meet the needs of competing modes of transportation. This action is necessary due to a significant increase in railway activity. We invite your comments on this proposed rulemaking. </SUM> <EFFDATE> <HD SOURCE="HED">DATES:</HD> Comments and related material must reach the Coast Guard on or before April 24, 2025. </EFFDATE> <HD SOURCE="HED">ADDRESSES:</HD> You may submit comments identified by docket number USCG-2022-0222 using Federal Decision Making Portal at <E T="03">https://www.regulations.gov.</E> See the “Public Participation and Request for Comments” portion of the <E T="02">SUPPLEMENTARY INFORMATION</E> section below for instructions on submitting comments. This notice of proposed rulemaking with its plain-language, 100-word-or-less proposed rule summary will be available in this same docket. <FURINF> <HD SOURCE="HED">FOR FURTHER INFORMATION CONTACT:</HD> If you have questions on this proposed rule, call or email Ms. Jennifer Zercher, Bridge Management Specialist, Seventh Coast Guard District; telephone 571-607-5951, email <E T="03">Jennifer.N.Zercher@uscg.mil.</E> </FURINF> <SUPLINF> <HD SOURCE="HED">SUPPLEMENTARY INFORMATION:</HD> <HD SOURCE="HD1">I. Table of Abbreviations</HD> <EXTRACT> <FP SOURCE="FP-1">CFR Code of Federal Regulations</FP> <FP SOURCE="FP-1">DHS Department of Homeland Security</FP> <FP SOURCE="FP-1">FR Federal Register</FP> <FP SOURCE="FP-1">OMB Office of Management and Budget</FP> <FP SOURCE="FP-1">NPRM Notice of Proposed Rulemaking (Advance, Supplemental)</FP> <FP SOURCE="FP-1">§ Section </FP> <FP SOURCE="FP-1">U.S.C. United States Code</FP> <FP SOURCE="FP-1">TD Temporary Deviation</FP> <FP SOURCE="FP-1">OWW Okeechobee Waterway</FP> <FP SOURCE="FP-1">FL Florida</FP> <FP SOURCE="FP-1">TIR Temporary Interim Rule</FP> <FP SOURCE="FP-1">NOI Notice of Inquiry</FP> <FP SOURCE="FP-1">SNOI Supplemental Notice of Inquiry</FP> <FP SOURCE="FP-1">FECR Florida East Coast Railway</FP> <FP SOURCE="FP-1">FEC Florida East Coast</FP> </EXTRACT> <HD SOURCE="HD1">II. Background, Purpose and Legal Basis</HD> The Florida East Coast (FEC) Railroad Bridge across the Okeechobee Waterway (OWW), mile 7.4, at Stuart, FL, is a single-leaf bascule bridge with a six-foot vertical clearance at mean high water in the closed position. The normal operating schedule for the bridge is found in 33 CFR 117.317(c). Railway activity significantly increased across the FEC Railroad Bridge. The Coast Guard is proposing to change the operating regulation for the railroad bridge to allow the drawbridge to operate a more predictable and reliable schedule to meet the needs of competing modes of transportation. On May 3, 2022, the Coast Guard published a Notification of Inquiry (NOI); request for comments in the <E T="04">Federal Register</E> (87 FR 26145). This NOI sought information from waterway users in response to provided questions. Those questions focused on waterway usage and navigation in the vicinity of the railroad and highway bridges. On June 10, 2022, a Supplemental Notification of Inquiry (SNOI); request for comments was published in the <E T="04">Federal Register</E> (87 FR 35472). The SNOI provided clarification on the Coast Guard's intent in gathering information. The Coast Guard was seeking information regarding usage and equitable access to the waterway. We received a total 2358 comments on those publications. Those comments were taken into consideration when developing the temporary test deviation published on June 8, 2023. On June 8, 2023, the Coast Guard published a notice titled “Temporary deviation from regulations; request for comments” in the <E T="04">Federal Register</E> (88 FR 37470) (Temporary Deviation 1). The deviation was effective from 12:01 a.m. on June 21, 2023, through 11:59 p.m. on December 17, 2023. Under Temporary Deviation 1, the railroad bridge opened twice an hour upon request and was required to remain in the open position if trains were not crossing the bridge. Additional operating requirements were specified by the Coast Guard. The comment period ended on August 4, 2023, with 371 comments received. Those comments were taken into consideration when developing Temporary Deviation 2, which was published on August 11, 2023. On August 11, 2023, the Coast Guard published a notice titled “Temporary deviation from regulations; cancellation” in the <E T="04">Federal Register</E> (88 FR 54488). This action cancelled Temporary Deviation 1, as it was determined FEC Railway (FECR) was experiencing extreme difficulty meeting the requirements of the temporary deviation. On August 11, 2023, the Coast Guard also published a notice titled “Temporary deviation from regulations; request for comments” in the <E T="04">Federal Register</E> (88 FR 54487) (Temporary Deviation 2). The deviation was effective from 12:01 a.m. on August 15, 2023, through 11:59 p.m. on December 17, 2023. Under Temporary Deviation 2, the railroad bridge was maintained in the fully open-to-navigation position, except during periods when it closed for the passage of train traffic. Additional operating requirements were specified by the Coast Guard, one of which was a fixed 15-minute opening period each hour. The comment period ended October 15, 2023, with 211 comments received. Those comments were addressed in Temporary Deviation 3, which was published on February 6, 2024. On November 7, 2023, the Coast Guard published a notice titled “Temporary deviation from regulations; reopening the comment period” in the <E T="04">Federal Register</E> (88 FR 76666). This action was necessary due to a delay in the start of passenger rail service. Due to the delay, the public was not afforded adequate opportunity to provide comments on Temporary Deviation 2 during actual passenger rail service operations. The comment period ended November 30, 2023, with 4 comments received. Those comments were addressed in Temporary Deviation 3, which was published on February 6, 2024. On December 7, 2023, the Coast Guard published a notice titled “Temporary deviation from regulations; modification” in the <E T="04">Federal Register</E> (88 FR 85111). The deviation was effective from 12:01 a.m. on December 18, 2023, through 11:59 p.m. on February 11, 2024. This action extended Temporary Deviation 2 to allow for the review of public comments, while providing continuity in the operation of the drawbridge. An additional comment period was not provided for the extension of Temporary Deviation 2 since multiple comment periods had already been provided. On February 6, 2024, the Coast Guard published a notice titled “Temporary deviation from regulations; request for comments” in the <E T="04">Federal Register</E> (89 FR 8074) (Temporary Deviation 3). The deviation was effective from 12:01 a.m. on February 12, 2024, through 11:59 p.m. on August 9, 2024. Under Temporary Deviation 3, the railroad bridge was maintained in the fully open-to-navigation position, except during periods when it closed for the passage of train traffic. Additional operating requirements were specified by the Coast Guard one of which was a fixed 10-minute opening period each hour. The comment period ended May 6, 2024, with one comment received. That comment is addressed below. On August 7, 2024, the Coast Guard published a Temporary Interim Rule (TIR) with request for comments in the <E T="04">Federal Register</E> (89 FR 64367). The temporary interim rule is effective from August 9, 2024, through 11:59 p.m. on December 31, 2024. This action was necessary to allow for continuity of drawbridge operations while the Coast Guard reviewed comments and the Coast Guard Commissioned Marine Traffic Study of the Okeechobee Waterway (St. Lucie) (study) associated with the temporary test deviation. The comment period for the TIR ended September 23, 2024, with one comment received. That comment is addressed below. On February 7, 2025, the Coast Guard published a TIR with request for comments in the <E T="04">Federal Register</E> (90 FR 9126). The temporary interim rule is effective from February 7, 2025, through 11:59 p.m. on May 31, 2025. The comment period ends on March 10, 2025. This action allows for continuity for drawbridge operations while the Coast Guard evaluates documentation received for a request to permanently change the operating regulation. The comment received from Temporary Deviation 3 expressed concern for the perceived overall negative impact of trains moving through the City of Stuart. This comment is outside of scope of the temporary deviation and will not be taken into consideration. The comment received from the TIR published on August 7, 2024, was in support of the active temporary deviation. However, the commenter expressed concern, believing the adjacent moveable highway bridge would be required to remain open to navigation during the overnight hours when the railroad bridge is required to be open except for the passage of railway traffic. The commentor misunderstood the temporary drawbridge operating schedule, as the highway bridge is allowed to remain in the down position until a vessel requests an opening. The Coast Guard commissioned an independent c ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Preview showing 10k of 26k characters. Full document text is stored and available for version comparison. ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
This text is preserved for citation and comparison. View the official version for the authoritative text.