<NOTICE>
NUCLEAR REGULATORY COMMISSION
<DEPDOC>[Docket No. 50-613; NRC-2024-0078]</DEPDOC>
<SUBJECT>US SFR Owner, LLC; Notice of Hearing</SUBJECT>
<HD SOURCE="HED">AGENCY:</HD>
Nuclear Regulatory Commission.
<HD SOURCE="HED">ACTION:</HD>
Construction permit application; Notice of uncontested hearing.
<SUM>
<HD SOURCE="HED">SUMMARY:</HD>
The U.S. Nuclear Regulatory Commission (NRC or the Commission) will commence an uncontested hearing, in which the Commission will receive written evidence in the form of testimony and exhibits regarding the application submitted by TerraPower, LLC (TerraPower), on behalf of US SFR Owner, LLC (USO), for a construction permit to construct a nuclear-powered generating plant termed Kemmerer Power Station Unit 1 in Lincoln County, Wyoming.
</SUM>
<DATES>
<HD SOURCE="HED">DATES:</HD>
The Commission may issue written questions to the parties (the NRC staff and the applicant) no later than January 12, 2026. For the full schedule for submitting documents in this hearing, see Sections V and VI of the
<E T="02">SUPPLEMENTARY INFORMATION</E>
section of this document.
</DATES>
<HD SOURCE="HED">ADDRESSES:</HD>
Please refer to Docket ID NRC-2024-0078 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods:
•
<E T="03">Federal Rulemaking Website:</E>
Go to
<E T="03">https://www.regulations.gov</E>
and search for Docket ID NRC-2024-0078. Address questions about Docket IDs in
<E T="03">Regulations.gov</E>
to Stacy Schumann; telephone: 301-415-0624; email:
<E T="03">Stacy.Schumann@nrc.gov.</E>
For technical questions, contact the individuals listed in the
<E T="02">For Further Information Contact</E>
section of this document.
•
<E T="03">NRC's Agencywide Documents Access and Management System (ADAMS):</E>
You may obtain publicly available documents online in the ADAMS Public Documents collection at
<E T="03">https://www.nrc.gov/reading-rm/adams.html.</E>
To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to
<E T="03">PDR.Resource@nrc.gov.</E>
The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.
•
<E T="03">NRC's PDR:</E>
The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email to
<E T="03">PDR.Resource@nrc.gov</E>
or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. Eastern Time, Monday through Friday, except Federal holidays.
<FURINF>
<HD SOURCE="HED">FOR FURTHER INFORMATION CONTACT:</HD>
Wesley W. Held, Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: 301-287-3591; email:
<E T="03">Wesley.Held@nrc.gov.</E>
</FURINF>
<SUPLINF>
<HD SOURCE="HED">SUPPLEMENTARY INFORMATION:</HD>
<HD SOURCE="HD1">I. Background</HD>
The Commission hereby gives notice that, pursuant to Section 189a of the Atomic Energy Act (AEA) of 1954, as amended, it will commence an uncontested hearing, in which the Commission will receive written evidence in the form of testimony and exhibits regarding the application submitted by TerraPower, on behalf of USO, for a construction permit to construct a nuclear-powered generating plant termed Kemmerer Power Station Unit 1 in Lincoln County, Wyoming.
TerraPower's application was submitted by letter on March 28, 2024 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24088A060).
The NRC staff's Final Environmental Impact Statement and Safety Evaluation Report may be viewed at ADAMS Accession Nos. ML25287A017 and ML25329A252, respectively. This mandatory hearing will concern safety and environmental matters relating to the requested construction permit application, as more fully described below.
<HD SOURCE="HD1">II. Evidentiary Uncontested Hearing</HD>
The Commission will conduct this hearing using written materials only. The schedule and process for submitting written materials to the Commission is detailed in Sections V and VI below. The parties to this proceeding are TerraPower and the NRC staff.
<HD SOURCE="HD1">III. Presiding Officer</HD>
The Commission is the presiding officer for this proceeding.
<HD SOURCE="HD1">IV. Matters To Be Considered</HD>
The matter at issue in this proceeding is whether the review of the TerraPower Kemmerer Power Station Unit 1 construction permit application by the Commission's staff has been adequate to support the findings found in 10 CFR 50.35, 50.40, 50.50, and 10 CFR 51.105. Those findings are as follows:
<HD SOURCE="HD2">Issues Pursuant to the Atomic Energy Act of 1954, as Amended</HD>
With respect to the construction permit: (1) whether the applicant has described the proposed design of the facility, including, but not limited to, the principal architectural and engineering criteria for the design, and has identified the major features or components incorporated therein for the protection of the health and safety of the
public; (2) whether such further technical or design information as may be required to complete the safety analysis, and which can reasonably be left for later consideration, will be supplied in the final safety analysis report; (3) whether safety features or components, if any, which require research and development have been described by the applicant and the applicant has identified, and there will be conducted, a research and development program reasonably designed to resolve any safety questions associated with such features or components; (4) whether on the basis of the foregoing, there is reasonable assurance that (i) such safety questions will be satisfactorily resolved at or before the latest date stated in the application for completion of construction of the proposed facility, and (ii) taking into consideration the site criteria contained in 10 CFR part 100, the proposed facility can be constructed and operated at the proposed location without undue risk to the health and safety of the public; (5) whether there is reasonable assurance (i) that the construction of the facility will not endanger the health and safety of the public, and (ii) that construction activities can be conducted in compliance with the Commission's regulations; (6) whether the applicant is technically and financially qualified to engage in the proposed activities in accordance with the Commission's regulations in chapter I of title 10 of the CFR; (7) whether the issuance of a permit for the construction of the facility to the applicant will not, in the opinion of the Commission, be inimical to the common defense and security or to the health and safety of the public; and (8) whether the application meets the standards and requirements of the AEA and the Commission's regulations, and that notifications, if any, to other agencies or bodies have been duly made.
<HD SOURCE="HD2">Issues Pursuant to the National Environmental Policy Act (NEPA) of 1969</HD>
With respect to the construction permit: (1) determine whether the requirements of Sections 102(2)(A), (C), and (E) of NEPA and the applicable regulations in 10 CFR part 51 have been met; (2) independently consider the final balance among conflicting factors contained in the record of the proceeding with a view to determining the appropriate action to be taken; (3) determine, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, whether the construction permit should be issued, denied, or appropriately conditioned to protect environmental values; and (4) determine whether the NEPA review conducted by the NRC staff has been adequate.
<HD SOURCE="HD1">V. Schedule for Submittal of Written Evidence</HD>
All documents to be filed by the parties as described below should be filed in accordance with the requirements of our E-filing rules at 10 CFR 2.304(g) and will be considered exhibits in this proceeding once filed.
No later than December 16, 2025, the NRC staff should E-file the following documents to add them to the docket for this hearing: (1) SECY-25-0102, which will serve as the NRC staff's primary written testimony in this hearing, (2) the construction permit application,
<SU>1</SU>
<FTREF/>
(3) the draft construction permit, (4) the safety evaluation, (5) the environmental impact statement, (6) the draft record of decision, and (7) any report submitted by the Advisory Committee on Reactor Safeguards in compliance with § 182(b) of the AEA and 10 CFR 50.58(a) regarding the Kemmerer Power Station Unit 1 construction permit and any NRC staff response thereto. If any of these documents are non-public, then the NRC staff should also file a public version, if practicable.
<FTNT>
<SU>1</SU>
If, due to its size, the application is too large to file through the E-filing system, the NRC staff may file a document that lists the ADAMS accession number for the package of each part of the application.
</FTNT>
No later than January 12, 2026, the Commission may issue written questions to one or both of the parties (the NRC staff and the applicant). If such questions are issued, party testimony responding to such questions, and associated exhibits (if any), are due January 26, 2026, unless the Commission directs otherwise. The applicant may also file additional written testimony by January 26, 2026.
<HD SOURCE="HD1">VI. Interested Government Participants</HD>
No later than January 2, 2026, any interested State, local government body, or Federally recognized Indian Tribe may file with the Commission a
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━