This is a normalized obligation summary extracted deterministically from regulatory text. The structured fields below are parsed from the source—not AI-generated summaries.
MandatoryFINAL
Obligation Structure
Actor
contractor
Modality
Mandatory
Duty
accepted by the CO CO
Conditions
If either plan is not accepted by the CO
Timing
within 7 days
Source Text
If either plan is not accepted by the CO, the contractor shall resubmit a revised plan within 7 days, or as agreed.