Requirements / 0eb9239648b1d7f7
This is a normalized obligation summary extracted deterministically from regulatory text. The structured fields below are parsed from the source—not AI-generated summaries.
Obligation Structure
- Actor
- operator
- Modality
- Mandatory
- Duty
- Removing residue from the crop planting row area crop planting row
- Timing
- prior to or as part of the planting operation is allowed
Source Text
Removing residue from the crop planting row area prior to or as part of the planting operation is allowed.
Stable ID: 0eb9239648b1d7f7