Requirements / 1572d8c508d571eb
This is a normalized obligation summary extracted deterministically from regulatory text. The structured fields below are parsed from the source—not AI-generated summaries.
Mandatory PROPOSED

Obligation Structure

Actor
grantee
Modality
Mandatory
Duty
grant and not yet drawn down

Source Text

Proposed § 93.409(a)(2)(i) requires that for all eligible costs incurred under the grant and not yet drawn down, the grantee must draw the funds down in a timely manner.

Lifecycle History

2/10/2026 ADDED — → PROPOSED 2024-30260

Subscribe to Updates

RSS Feed for this Obligation

Get notified when this obligation is modified in proposed, final, or codified rules.

Stable ID: 1572d8c508d571eb