Requirements / 20b716a4c7fb7599
This is a normalized obligation summary extracted deterministically from regulatory text. The structured fields below are parsed from the source—not AI-generated summaries.
Obligation Structure
- Actor
- generator
- Modality
- Mandatory
- Duty
- installed steam generator must be performed prior to plant
- Conditions
- When applying the provisions of NB-5283 in the 2019 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section
- Timing
- prior to plant startup
Source Text
When applying the provisions of NB-5283 in the 2019 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, a full-length preservice examination of 100 percent of the steam generator tubing in each newly installed steam generator must be performed prior to plant startup.
Stable ID: 20b716a4c7fb7599