With respect to operation at the projected initial power level, the applicant is required to submit information prescribed in paragraphs (a)(2) through (a)(8) of this section, as well as the information required by this paragraph, in support of the application for a construction permit, or a design approval.
Get notified when this obligation is modified in proposed, final, or codified rules.
451702a2d0da3ebf