Requirements / 451702a2d0da3ebf
This is a normalized obligation summary extracted deterministically from regulatory text. The structured fields below are parsed from the source—not AI-generated summaries.
Mandatory FINAL

Obligation Structure

Actor
applicant
Modality
Mandatory
Duty
submit information prescribed in paragraphs (a)(2) throu

Source Text

With respect to operation at the projected initial power level, the applicant is required to submit information prescribed in paragraphs (a)(2) through (a)(8) of this section, as well as the information required by this paragraph, in support of the application for a construction permit, or a design approval.
Source Document: 2024-30721
Agency: Nuclear Regulatory Commission
CFR Parts: 10 CFR 2, 10 CFR 20, 10 CFR 26, 10 CFR 50, 10 CFR 51, 10 CFR 55, 10 CFR 73, 10 CFR 140, 10 CFR 170, 10 CFR 171
Requirement Type: reporting recordkeeping

Lifecycle History

2/10/2026 ADDED — → FINAL 2024-30721

Subscribe to Updates

RSS Feed for this Obligation

Get notified when this obligation is modified in proposed, final, or codified rules.

Stable ID: 451702a2d0da3ebf