Requirements / 4a789e3f5b47aee5

Operator MUST inspect stage 2 high

FINAL
Actor
operator
Obligation
MUST
Action
Inspect the stage 2 high-pressure turbine (HPT)
Object
stage 2 high

Source Text

Inspect the stage 2 high-pressure turbine (HPT) nozzle assembly honeycomb for rubs in accordance with the Accomplishment Instructions, paragraphs 5.A.(4)(a)4b or 5.B.(4)(a)3b of CFM SB LEAP-1A-72-00-0562-01A-930A-D, Issue 002-00.
Source Document: 2026-01152
Agency: Transportation Department
CFR Parts: 14 CFR 39
Requirement Type: inspection maintenance

Lifecycle History

2/4/2026 ADDED — → FINAL 2026-01152

Subscribe to Updates

RSS Feed for this Requirement

Get notified when this requirement is modified in proposed, final, or codified rules.

Stable ID: 4a789e3f5b47aee5