Requirements / 5f7acfa779ff9487
This is a normalized obligation summary extracted deterministically from regulatory text. The structured fields below are parsed from the source—not AI-generated summaries.
Mandatory FINAL

Obligation Structure

Actor
operator
Modality
Mandatory
Duty
test or continuous emissions monitoring systems (CEMS)
Timing
within 60 days

Source Text

Within 60 days after the date of completing each performance test or continuous emissions monitoring systems (CEMS) performance evaluation that includes a relative accuracy test audit (RATA), you must submit the results following the procedures specified in paragraph (g) of this section.
Source Document: 2026-00677
Agency: Environmental Protection Agency
CFR Parts: 40 CFR 60
Requirement Type: inspection maintenance

Lifecycle History

2/9/2026 ADDED — → FINAL 2026-00677

Subscribe to Updates

RSS Feed for this Obligation

Get notified when this obligation is modified in proposed, final, or codified rules.

Stable ID: 5f7acfa779ff9487