Requirements / 89e1965074e8c641
This is a normalized obligation summary extracted deterministically from regulatory text. The structured fields below are parsed from the source—not AI-generated summaries.
Mandatory FINAL

Obligation Structure

Actor
operator
Modality
Mandatory
Duty
terminates at the end of the current term of the prescriptio end of the
Conditions
If the Board does not act within 90 days from the close of briefing
Timing
within 90 days

Source Text

If the Board does not act within 90 days from the close of briefing, the prescription automatically terminates at the end of the current term of the prescription.
Source Document: 2024-09483
Agency: Surface Transportation Board
CFR Parts: 49 CFR 1145
Requirement Type: compliance deadline

Lifecycle History

2/12/2026 ADDED — → FINAL 2024-09483

Subscribe to Updates

RSS Feed for this Obligation

Get notified when this obligation is modified in proposed, final, or codified rules.

Stable ID: 89e1965074e8c641