Requirements / 8b417fbbaf61059b

Operator MUST install On Aircraft

FINAL
Actor
operator
Obligation
MUST
Action
Installed On Aircraft
Timing
Within 30 days

Source Text

Within 30 days after the effective date of this AD or upon installation of an affected engine, whichever occurs later, remove one loop cushion clamp, part number ST1540-06, from the hydraulic fuel pressure fuel oil cooler fuel tube assembly (CP09 tube assembly) in accordance with the Accomplishment Instructions, For Engines Installed On Aircraft, paragraph C, or For Engines Not Installed On Aircraft, paragraph A, of Pratt & Whitney (PW) Alert Service Bulletin (ASB) PW1000G-C-73-00-0053-00A-9
Source Document: 2026-00330
Agency: Transportation Department
CFR Parts: 14 CFR 39
Requirement Type: compliance deadline

Lifecycle History

2/4/2026 ADDED — → FINAL 2026-00330

Subscribe to Updates

RSS Feed for this Requirement

Get notified when this requirement is modified in proposed, final, or codified rules.

Stable ID: 8b417fbbaf61059b