This is a normalized obligation summary extracted deterministically from regulatory text. The structured fields below are parsed from the source—not AI-generated summaries.
MandatoryFINAL
Obligation Structure
Actor
grantee
Modality
Mandatory
Duty
use of energy
Source Text
To the extent practicable, a grantee must design and construct facilities to maximize the efficient use of energy.